Animated Feature – April 5, 2010

So the music was done and gradually being mixed and edited, but things have been dragging on in part because the film was not done and we had the time.

But that is no longer the case.

I am very excited to report that the sound effect and foley work is set to begin any day over at Sharpe Sound (on of the top post houses in town), which means music has to be done and delivered very soon.

I was asked by the director to bring the final animation video over to Sharpe Sound, which I did this morning. Got the tour of the place (which is fabulous) and spoke with Kirby (the post sound supervisor) about our schedule and requirements.

So this is the home stretch and almost done!

Alain

Leave a Reply

You must be logged in to post a comment.